<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Services. From study to operation. on Battalion Energy</title><link>https://battalion.energy/services/</link><description>Recent content in Services. From study to operation. on Battalion Energy</description><generator>Hugo</generator><language>en-US</language><atom:link href="https://battalion.energy/services/index.xml" rel="self" type="application/rss+xml"/><item><title>Modeling and optimization.</title><link>https://battalion.energy/services/modeling-and-optimization/</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://battalion.energy/services/modeling-and-optimization/</guid><description>&lt;section class="editorial-row wrap"&gt;&#10; &lt;p class="eyebrow"&gt;01 / ANALYSIS&lt;/p&gt;&#10; &lt;div class="editorial-copy"&gt;&#10; &lt;h2&gt;Advanced modeling across the full operating duty.&lt;/h2&gt;&#10; Battalion uses the Energence energy intelligence platform for these studies. A storage project can serve a load and a market at the same time. Battalion models both sides of the meter together, including the energy held for backup and the battery life each dispatch consumes.&#10; &lt;ul class="modeling-list"&gt;&lt;li&gt;Scenario analysis across four coincident peaks (4CP), five coincident peaks (5CP) and twelve coincident peaks (12CP).&lt;/li&gt;&lt;li&gt;Energy arbitrage and ancillary services by market.&lt;/li&gt;&lt;li&gt;Front-of-the-meter and behind-the-meter economics in one model.&lt;/li&gt;&lt;li&gt;Tariff-accurate bill simulation.&lt;/li&gt;&lt;li&gt;Power smoothing, ramp rate and ride-through simulation at millisecond resolution.&lt;/li&gt;&lt;li&gt;Sizing and duration optimization.&lt;/li&gt;&lt;li&gt;Battery life and degradation curves.&lt;/li&gt;&lt;li&gt;Warranty-constraint modeling.&lt;/li&gt;&lt;li&gt;Eight North American markets modeled, with an operating fleet in ERCOT, CAISO and Mexico.&lt;/li&gt;&lt;/ul&gt;&#10;&#10; &lt;div class="market-coverage"&gt;&lt;p class="eyebrow"&gt;EIGHT NORTH AMERICAN MARKETS&lt;/p&gt;</description></item><item><title>Engineering and integration.</title><link>https://battalion.energy/services/engineering-and-integration/</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://battalion.energy/services/engineering-and-integration/</guid><description>&lt;section class="editorial-row wrap"&gt;&#10; &lt;p class="eyebrow"&gt;01 / HARDWARE&lt;/p&gt;&#10; &lt;div class="editorial-copy"&gt;&#10; &lt;h2&gt;Integrated skids and auxiliary power distribution.&lt;/h2&gt;&#10; &lt;p&gt;Integrated skids bring the required equipment interfaces into a defined assembly. Auxiliary power distribution supplies the controls and supporting equipment, with two sources where the critical-power design requires them.&lt;/p&gt;&#10;&lt;p&gt;Control panels bring together sub-block controllers, network interfaces and power distribution. Controller pairing and power-source changeover follow the system availability design.&lt;/p&gt;&#10;&#10; &#10; &#10; &#10; &lt;/div&gt;&#10;&lt;/section&gt;&#10;&#10;&lt;section class="editorial-row wrap"&gt;&#10; &lt;p class="eyebrow"&gt;02 / INTERFACES&lt;/p&gt;&#10; &lt;div class="editorial-copy"&gt;&#10; &lt;h2&gt;Protocol integration and plant control.&lt;/h2&gt;&#10; &lt;p&gt;Battery management systems, power conversion systems (PCS), switchgear and meters need agreed data models and command priorities. Battalion develops equipment mappings, handles communication loss and checks control behavior before site operation.&lt;/p&gt;</description></item></channel></rss>