<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Journal on Battalion Energy</title><link>https://battalion.energy/blog/</link><description>Recent content in Journal on Battalion Energy</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Thu, 08 Oct 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://battalion.energy/blog/index.xml" rel="self" type="application/rss+xml"/><item><title>Critical power for factories in Mexico</title><link>https://battalion.energy/blog/critical-power-for-factories-in-mexico/</link><pubDate>Thu, 08 Oct 2026 00:00:00 +0000</pubDate><guid>https://battalion.energy/blog/critical-power-for-factories-in-mexico/</guid><description>&lt;p&gt;A factory in Mexico should plan for its grid supply to be interrupted. A battery-based uninterruptible power supply (UPS) at medium voltage answers that: it feeds the critical process through its own converter, with 0 ms transfer, so the line keeps running through an outage or a sag.&lt;/p&gt;&#10;&lt;h2 id="what-the-public-record-says"&gt;What the public record says&lt;/h2&gt;&#10;&lt;p&gt;Mexico&amp;rsquo;s central bank asked manufacturers with more than 100 workers whether their regular electricity supply had been interrupted in the previous 12 months. In the south, 81.6 percent said yes. In the central region it was 55.0 percent and in the north 49.7 percent. The figures are from Banco de México&amp;rsquo;s regional survey, as cited in the &lt;a href="https://www.bbvaresearch.com/wp-content/uploads/2024/09/Eng-Encuesta-BBVA-AMPIP-2024.pdf"&gt;BBVA Research and AMPIP nearshoring survey of September 2024&lt;/a&gt;.&lt;/p&gt;</description></item><item><title>ERCOT's proposed 10 MW power variation limit for AI data centers</title><link>https://battalion.energy/blog/ercot-10-mw-power-variation-limit-for-ai-data-centers/</link><pubDate>Mon, 05 Oct 2026 00:00:00 +0000</pubDate><guid>https://battalion.energy/blog/ercot-10-mw-power-variation-limit-for-ai-data-centers/</guid><description>&lt;p&gt;ERCOT has proposed a power variation limit for large computational loads. The peak-to-peak change in a site&amp;rsquo;s active power, filtered to keep everything from 0.1 Hz to 55 Hz, may not exceed 10 MW in any rolling 5-second window. ERCOT presented the proposal to its Large Load Working Group in February, April and June 2026 and said it would file the revision request in the second quarter of 2026. As of October 5, 2026 no revision request carrying the limit appears in ERCOT&amp;rsquo;s list of pending requests, so the limit is a proposal and its final wording can still change.&lt;/p&gt;</description></item><item><title>Why data centers must now ride through grid faults</title><link>https://battalion.energy/blog/why-data-centers-must-ride-through-grid-faults/</link><pubDate>Mon, 05 Oct 2026 00:00:00 +0000</pubDate><guid>https://battalion.energy/blog/why-data-centers-must-ride-through-grid-faults/</guid><description>&lt;p&gt;On July 22, 2026, at 7:56 in the morning, a 230 kV transmission line in Northern Virginia faulted. The protection cleared it as designed. Within about a minute, approximately 3,800 MW of data center load had moved off the grid and onto backup power, the largest load transfer PJM has recorded. PJM had seen similar events in the same area in July 2024 and February 2025, and this one was about twice as large.&lt;/p&gt;</description></item><item><title>Why your AI data center needs a battery</title><link>https://battalion.energy/blog/why-a-battery-for-your-ai-data-center/</link><pubDate>Fri, 02 Oct 2026 00:00:00 +0000</pubDate><guid>https://battalion.energy/blog/why-a-battery-for-your-ai-data-center/</guid><description>&lt;p&gt;An AI data center presents two power problems at once. Graphics processing unit (GPU) and tensor processing unit (TPU) clusters can swing tens of percent of facility load in under a second, every 20 seconds or so, thousands of times a day. The grid sees those changes at the connection. The compute equipment also depends on continuity of supply. A voltage sag that trips rack power supplies forces training to restart from its last checkpoint.&lt;/p&gt;</description></item></channel></rss>